Skip to main content

Adjusting Your Scope After an Estimate Is Generated

Two ways to change the scope once an estimate already exists — small additions through the AI Assistant, or editing the Scope tab and regenerating — and what each one does to the estimate you already built.

Overview

Sometimes you notice a missed detail — a tile you meant to include, a trade that got left out — only after the estimate already exists. You have two ways to fix it, and which one to use comes down to how big the change is and whether you want to keep the estimate you've already built.

  • Small addition or correction — use the AI Assistant on the estimate. Your existing estimate stays intact.

  • Large or structural change — edit the scope and create the estimate again. This replaces the existing estimate.


Best practice: refine the scope before you create the estimate

The best results still come from spending time on the Scope page before you create the estimate. That's where you review what the AI captured from your plans, photos, or description and fill in the gaps — adding the trades, materials, and details you want up front produces a more accurate estimate and saves rework later.

Everything below is the recovery path. It works, but it's more work than getting the scope right the first time. See Reviewing Your AI Scope of Work and Scope of Work Prompting.


Option 1: Small additions with the AI Assistant

Use this when you need to add a missed trade, correct a quantity, or adjust a handful of line items — and you want to keep the estimate you already have.

  1. Open the estimate and click Edit Estimate. The AI Assistant panel is on the left.

  2. Describe what's missing and ask the Assistant to add it — for example: "Add wall tile to the primary bathroom, approximately 120 sq ft, mid-range finish."

  3. Review the changes the Assistant proposes and confirm they landed in the right category.

The Assistant edits the estimate in place. Nothing is deleted and the estimate is not recreated, so your fees, markup, and manual line-item edits are preserved. Each change is saved as a version card in the panel, and you can use View or Revert on a card to look at or go back to an earlier version.

The Assistant works best on smaller, targeted requests. If you're rewriting large portions of the scope, use Option 2 instead — many small Assistant edits tend to give a messier result than one clean rebuild.


Option 2: Edit the scope and create the estimate again

Use this when the underlying scope itself is wrong — whole trades missing, quantities that need remeasuring, or a structural change to how the work is broken down.

⚠️ This replaces your existing estimate. Creating a new estimate from an edited scope deletes the current one and builds a fresh estimate in its place. Any manual line-item edits, fees, discounts, or markup adjustments you made on the old estimate are not carried over. Read any confirmation dialog KonstructIQ shows, because the step can't be undone.

Save a copy first

Before you recreate the estimate, it's worth keeping a record of what you had:

  • On the Scope page, click Options → Download to save the current scope.

  • If the estimate has manual pricing work you'll need to redo, export it first — see Exporting an Estimate as a CSV File.

Make the changes and create the estimate

  1. Go to the project's Scope page in the left navigation.

  2. Click Edit Scope.

  3. Make your changes — click an item to edit its name, description, quantities, units, tags, and location in the detail panel; use the ⋮ menu on a category to add an item or category; or ask the Assistant for changes in plain language.

  4. If a quantity needs to come off the drawings rather than an AI assumption, click Edit in Takeoff in the item's detail panel — see Using the Takeoff Tool.

  5. When the scope is right, click Create Estimate in the header.

  6. Read any confirmation warning, then confirm. The previous estimate is replaced and a new one is built from your updated scope.


Scope page vs. Summary Scope of Work

These two are easy to confuse, and mixing them up is the most common reason people take the long route unnecessarily.

  • The Scope page is what the estimate is actually built from. Change it and you change the pricing — which is why you have to create the estimate again.

  • The Summary Scope of Work box on the estimate's Info tab is the plain-language description the client reads. Editing it changes only what's shown on the estimate document. It does not affect line items, pricing, or anything downstream.

If you only need to reword what the client sees, edit the Summary box — see Editing the Summary of Work for an Estimate.


Troubleshooting & FAQs

  • Which option should I use? If you can describe the fix in a sentence or two, use the AI Assistant on the estimate. If you'd be asking it for more than a few changes, edit the scope and create the estimate again instead.

  • Can I create the estimate again without losing my current one? No. Creating from an edited scope replaces the existing estimate. Download the scope and export the estimate first if you need a record of either.

  • I get an error when adding a trade through the Assistant. Try a smaller, more specific request — one trade at a time, with quantity and finish where you can. Repeated failures usually mean you've hit the Assistant's context limit; duplicating the project gives you a clean chat history to work from.

  • The Assistant added the item to the wrong category. Ask it to move the item, or use the Move to category option in Bulk edit on the estimate.

  • A whole trade is missing from the scope. Open Edit Scope, then in the Assistant run Show page-to-trade map. If the trade shows Primary: None, your drawings may not cover it — add the items manually or upload the missing sheets.

  • I only need to change what the client sees. Edit the Summary Scope of Work box on the Info tab. Nothing needs to be recreated.


Quick Reference

Before creating the estimate: refine everything on the Scope page — the cheapest place to catch a missed trade.

Small addition, keep the estimate: Edit Estimate → AI Assistant → describe the missing item with quantity and finish.

Large change, rebuild the estimate: Scope → Options → Download (save a copy) → Edit Scope → make changes → Create Estimate → confirm any warning.

⚠️ Creating the estimate again replaces the existing one. Manual edits, fees, and markup on the old estimate are lost.

Client-facing wording only: estimate → Info tab → Summary Scope of Work.

Did this answer your question?