Skip to main content

Adjusting Your Estimate's Price Per Square Foot

How to retarget an entire estimate to a specific price per square foot, choose whether markup, costs, or both absorb the change, and review, apply, or revert the result.

Overview

The $/SF tool retargets an entire estimate to a specific price per square foot in one pass, instead of you editing line items one at a time. You set the price per square foot you want, choose whether KonstructIQ moves your markup, your costs, or both, and review the exact dollar impact before anything changes.

Where to find it: open the project's estimate, click Edit, then use the $/SF value in the summary bar or the Quick actions menu in the Assistant panel.


Step 1: Open the price-per-square-foot tool

On the Edit Estimate page, there are two ways in:

  • Click the $/SF value in the summary bar at the top of the page, next to Total.

  • Click the + (Quick actions) icon in the Assistant chat box, then select $/SF — Adjust price per square foot.

Note: the floor area shown next to the tool (for example, "543 SF") is the project's floor area — it's shown for reference and isn't something you set inside this tool.


Step 2: Set your target and choose your levers

  1. Under What $/SF should I aim for?, enter the price per square foot you want. The panel shows your current $/SF and floor area for reference.

  2. Under How should I hit it?, keep or clear Adjust markup (moves the markup the estimate earns) and Adjust costs (moves the cost of line items). Both are selected by default — you can use one or both.

  3. Under Apply to costs & markup for, choose All Items, Labor, or Materials to control which line items absorb the change. All Items is selected by default.

  4. Click Adjust to $[your target]/SF.

Tip: to raise your price per square foot without changing your underlying costs, clear Adjust costs and leave only Adjust markup selected.


Step 3: Review and apply the changes

The Assistant works out how to hit your target and posts a breakdown showing each lever's current value next to its proposed new value — Labor cost, Materials cost, and Markup, whichever levers you kept — along with the resulting New total and New $/SF.

Review the breakdown, then:

  • Click Yes to apply the changes. KonstructIQ updates every affected line item and saves a new version of the estimate.

  • Click No to cancel. Nothing changes, and you can ask for a different target right away.


Troubleshooting & FAQs

  • The Adjust button is greyed out. Enter a $/SF value that's different from the current one — the button only activates once the target has changed.

  • Can I move only markup without touching my costs? Yes. Clear Adjust costs under How should I hit it? and leave only Adjust markup selected.

  • Can I move only Labor or only Materials? Yes. Choose Labor or Materials instead of All Items under Apply to costs & markup for.

  • Does this change every line item? With All Items selected, costs and markup move proportionally across the whole estimate. Choosing Labor or Materials narrows the change to just that cost type.

  • I clicked No — did anything change? No. Declining leaves your estimate exactly as it was, and the Assistant confirms nothing was applied.

  • Where does the floor area (SF) number come from? It's the project's floor area, shown for reference in the tool — it isn't editable from this panel.


Quick Reference

Path: Project → Estimate → Edit → click $/SF in the summary bar (or + → $/SF in Assistant) → set target → choose levers → Adjust to $[X]/SF → Yes.

Levers: Adjust markup, Adjust costs, or both — applied to All Items, Labor, or Materials.

Don't skip: the confirmation breakdown — check the New total and New $/SF before clicking Yes.

Did this answer your question?